Rail Civil Engineering - On-going Projects
Photo Gallery
- Construction of Private Railway Siding of AAPL at Kandra (Phase-II)
- Railway siding, Bridges, Installation of OHE to serve Dankuni Steels at Dusi
- Doubling between Gobardanga to Chandpara in connection with doubling work between Chandpara –Bangaon.
- Construction of RCC Box ROBs and RUBs return and other ancillary work in connection with Dumka-Rampurhat new BG Line
- Supplying & transporting of blanketing materials & other misc. works in connection with doubling of Barasat –Hasnabad section
- Construction of Additional Railway Lines at Gangavaram Port/>
- Construction of Railway Siding Job at HPCL Bihta,
- Track Laying jobs at Paradeep, Terminal
- Supply of Rails for Ennore Terminal
- Rail track modification & OHE Worksat Lafarge in Jamshedpur
- Construction of Railway Siding Job at Anpara, UP
- Modernization of Kharagpur Workshop – Phase-II
- Upkeep of track and track bed between Tollugunge to New Garia of Metro Railway, Kolkata
- Upgradation of Private Railway Siding of NMDC, Dantewada,Chattisgarh
- Construction of New Line between Dankuni-Furfura Sharif in Howrah Division of Eastern Railway.
- Dedicated Railway Track for movement between Maroda Exchange Yard to Boria Complex.
- Additional Railway Track parallel to existing Rail line No. 107 connecting Rolling Mill Post to Open Hearth Station
- Track Layout for Pusher Car & Wagon Tippler No:1 & 2 for Durgapur Steel Plant.
- Dismantling / Construction of Railway Track connecting to CEM Shop (PKG-INFRA-08)
- Construction of Private Railway Siding at Thakurani Mines, Barbil, Dist-Keonjhar, Orissa
- Construction of Railway Siding near Milavittan Railway station at Tuticorin India.
Photo Gallery